Hedgerow Dr Peters Twp

We recently completed a project for Verizon FiOS installing underground conduits to allow a whole street of new customers access to Verizon FiOS.  This was done over a couple weeks time during early winter of November 2016.   We placed over 5000 feet of conduit for Verizon and set new boxes flush with the ground to be the least intrusive as possible.  All done with a directional drill to avoid a large mess of digging up all of the properties on the street to get the prospected future customer of Verizon FiOS as happy with the work as possible.  Our Project Supervisor Chuck Renner prides himself on leaving jobs as well maintained as before to work started.    This job shows his pride first hand.